drum roll please....ok maybe not but here are the pics of my plumbing
first off some of my mess that my wife nagged me about for a few days
heres the back side of the tank
some of you may notice the balck coupler and wonder why? I added the 90 and the union conector wothout putting the threaded part of the union on first so I had to cut into this and then reglue it with a coupler
4 way
closer with return running over 4 way returns, may switch it to run under though
pulled back for a shot of the working room that I have left, I was pleasently suprised at how much space was left after cramming all that stuff unde there
and finall my two drains, one will feed both my skimmer and 2xtlf reactors and the other will t and dump into skimmer section and fuge
For the feeding of the reactors and skimmer Im using some black flex hose found at hd and it looks awesome! I still need to get my hands on a micro ball valve to control the flow and then give my fuge some flow direction to make the chaeto roll but thats about it!!!
Ill also be mounting my perstaltic pump on the open space on this wall. This will pull from the fuge adn dump back into the return section after running through and feeding my ca reactor!
ready for water but I need to hang my lights before I fill it...one more road block. My cieling joists are not centered on the tank so I have to get someone into my attic to run cross bracing that I can mount to
Im just too darn big to even attempt it...lol