UPDATED News from the Room's Front!
These are some of the plans I have:
- Wednesday, finally workers finished all the room, even the tile floor is installed!
- Wednesday, bought the rail slides for the roof to hold and swing the hood, they are German made and can hold up to 200kgs of weight.
- Thursday, Finish installing the metal beam support for the tank, and wood with foam for soft support underneath it.
- Thursday, Painting will take place to all the inner side of the room (The important part LOL).
- Thursday, Actual tank begins on disassembling process, fish are going to be taken out and house at the LFS.
- Friday, Tank goes in! Hopefully
AND WITH PICTURES AND VIDEO
- Friday, Electric wiring commences.
- Friday, Begin moving stuff from former tank to actual tank.
- Saturday, premade structures for using as table and holding supplies as well as water depot frames will come in to be installed.
- Monday, Major moving begins...