I was going to start building the new sump stand today, but a hangover got in the way. Instead, I spent the morning playing with google sketchup. I introduce to you, Fish Room 2.0 (minus the plumbing)
The DT will drain into both 40B's (controlled by gate valves) which will then each will independently drain into the sump so that either one could be pulled offline. I will also drop a primary DT drain line into the sump in case I ever needed to pull both FT & Fuge offline, but it will be closed in normal operation. The DT backup drain line will only drop straight into the sump.
The change is the sump is currently all the way in the corner and the FT stand is shifted out a bit. So I am shifting the sump over to the right approx 4' and then sliding the FT stand into the corner and making it long enough to handle 2 40B's.
I'm away the next 2 weekends, so this won't get off the ground until mid Sept.