I am in a dilemma.. I need to know the height the hole should be drilled for a sequence pump. The pump has not arrived yet and I am going to get the sump drilled today.
The sump is a 40 gal breeder and the return pump will be a Sequence Tarpon. I will place the pump on a thick mouse pad for insulation.
I will be using the 1" bulkhead (heavy duty schedule 80) double threaded which requires a 1 7/8" hole.
Can someone tell me how high the 1 7/8" hole should be drilled? Measurements to the bottom of the 1 7/8" hole would be perfect.
The sump is a 40 gal breeder and the return pump will be a Sequence Tarpon. I will place the pump on a thick mouse pad for insulation.
I will be using the 1" bulkhead (heavy duty schedule 80) double threaded which requires a 1 7/8" hole.
Can someone tell me how high the 1 7/8" hole should be drilled? Measurements to the bottom of the 1 7/8" hole would be perfect.