TMC v2 pure 50 RO system - assembly confusion

Matt spivey

Member
I've got this system here and I don't want to break anything. The instructions aren't too clear, pictures would have helped.

I know how to assemble it basically and connect the lines to the right areas but I got the deionising pod with it and there are no connection instructions.

There's nothing on how to flush it or what this even means/why and when you do it either.

I've obviously never owned an RO system before but the instructions should be aimed at people like me!

I need a way of connecting it to a tap that doesn't have a threaded end (can't screw anything on) and also one with a threaded end (outside tap) so I can use it indoors and out depending on the weather.
 

Matt spivey

Member
I've added the deionising pod and used some cut off tubing, hope this is right.. I tried to route the Tds meter to go after the deionising pod as you can see with blue tubing.

I wanted to measure the Tds post deionisation to let me know when I should replace the DI pod
 

Matt spivey

Member
ugaquta4.jpg


5yry4ava.jpg
 
Top