chickenjohn
Well-Known Member
LolHe first has to attend the two week Apex Training Course, then work 80 hours per week for two months to pay for it.
LolHe first has to attend the two week Apex Training Course, then work 80 hours per week for two months to pay for it.
Looks like Christmas Pancho! Lol
Are you getting Trident ?
It’s not available in the UK yet but I’m definitely getting it when it arrives
The idea is to install on the week of Aug 25 when I am in MX. I think I will have to work at nights.when are putting it in?
I know ! LOLHe first has to attend the two week Apex Training Course, then work 80 hours per week for two months to pay for it.
Yes you can control multiple systems but you need a connecting cable which doesn’t sound much use certainly in my caseIt does looks like Christmas Shaun ! LOL
Honestly I was avoiding the whole controlling thing but now that I have taken the plunge with Neptune definitely Trident is in the plan but given the lack of supply at the moment I will focus first in the DOS, ATF and COR-20s. I think it will be good to have the whole Apex-Trident-DOS system working. How about you, I think you can control two systems with one Apex, right?
It’s about reefing!
Honestly you won’t need anything, Apex is simple to use and the current software includes templates to automatically set systems up.I know ! LOL
Now I am watching YouTube tutorials (instead of the regular fun videos) and have to read a ton materials, do you have any interest to go to Mexico and help me installing it? LOL
Yes I already subscribed Neptune Apex, so far it does not look complicated. I have to say I feel like a kid with a new toy. [emoji1787]Honestly you won’t need anything, Apex is simple to use and the current software includes templates to automatically set systems up.
Even the advanced programming is relatively simple and if you need any help there is the Neptune Apex forum with loads of help from advanced users.
I always have an interest in Mexico, preferably 2 weeks on the Riviera maya.do you have any interest to go to Mexico and help me installing it?
lolI always have an interest in Mexico, preferably 2 weeks on the Riviera maya.
Not too sure id be much help on the apex, though if your willing to pay me to stay in Riviera maya for 2 weeks I could be willing to put aside a day to at least give you a hand unboxing it.
Only fair as you two are now apex brothers, I can be the GHL outcast and Nobby can bring the Sauerkraut.I am still waiting for Shaun to invite us to the BBQ !
That is the food of the Devil. BBQ equals meat, bread and beer. Nothing else required.Only fair as you two are now apex brothers, I can be the GHL outcast and Nobby can bring the Sauerkraut.
I agree ! in Mexican case also tortillas lol.That is the food of the Devil. BBQ equals meat, bread and beer. Nothing else required.
Yes I thought on the the velcro too, as I am concern about the panels and wanting to move the things later. The Max panels just seem too “pretty” to put screws on them lol. Of course I can order new panels from Red Sea also so I am leaning toward using the screws.I basically got a piece of board and used heavy duty Velcro to stick the units into place for ease of removal, not that you need to remove them very often.
Most of the modules can be screwed into place as well so it’s personal choice
My wire management is certainly going to be ‘improved’ in the new system as is a major part of the planning and yes you could remove the power centre. It’s just a plug box in reality and Apex is a little more advanced.