| Re: My slow 135g build I'm starting on the plumbing for the CLS, hopefully i can get some help on how to run the plumbing since all the bulkheads in my tank are 3/4" and the inlet for the snapper is 2". Two of the drains will merge together and enter the pump. I have a few questions, 1) will that be enough water flow or will air pockets form? 2) should the lines be merged furthest or closest to the pump? |