Now, the controller pieces.
First, the top piece is the power supply for the Ethernet module, and all of the control and monitor modules.
The blue piece is the ethernet module which I have connected to my network so I can attach to it from any PC.
This is the sensor module and it provides me information from all of the probes, such as the float switchs, flow switches, PH probe, etc. The electric box is going to be removed once I get the two pumps hooked into the relays.
This is the relay rack. The bigger relays at the bottom will have the higher powered devices connected to them, such as the pumps. The smaller ones have everything else connected to them, such as the top off pump, MH's, T5, moon lights (blue, white), etc.
This is the control module. I can control up to 13 devices with this module.
Here are the extension cords that we just finished running from the relays to up behind the tank. I'll hook these up tomorrow. One each for MH1, MH2, T5, Blue Moonlight, White Moonlight.
No comments about the Barbie book either!!! I like to read before bed...
