Here's a quick shot of the semi finished wall. Only thing left is the baseboard & trim around the tank opening.
The inside of the wall was finished in drywall but I will be putting several coats of kitchen & bath paint thats mold & mildew resistant so I think it will be ok.
I took a couple shots of the bulkheads thats scattered across the bottom of the tank. The spraybar was part of the original setup, i'm think of have it spray from the top instead. what would keep that spraybar from draining the hole tank when power outages? are there big enough check valves for a drain line.
