| In that case you can build a base for the first piece, make it high enough so you can drain into the second, still you will need to have the bulkhead on the upper portion of the second piece. This will allow for a full pump return section at all times. You can pump externally with one of the other holes an d plug the others unless you have need for them.
__________________ Scott Ardoin (Ard-Dwan) |