View Single Post
Old 04-22-2007, 04:07 PM   #4 (permalink)
The Aspilonker
Tunicate
 
The Aspilonker's Avatar
 
Join Date: Apr 2007
Location: Mexico City
Posts: 23
Talking step 2.1

Here it is:

The tank Drilled an with bulkheads in place

4 x 1" bulkheads for the drain process
3 x 3/4" bulkheads for the return lines
2 closed loops all with 3/4" bulkheads...
Attached Images
File Type: jpg ntwh4w.jpg (21.8 KB, 92 views)
__________________
Make it happen!!!
The Aspilonker is offline   Reply With Quote
Page generated in 0.07997 seconds with 9 queries