| Re: 5x turnover enough for frag tank 3/4 threaded bulkhead -> threaded pvc joiner -> 3/4" pvc -> 3/4" 90 degree pvc elbow
down facing 3/4" pvc
tee fitting -> 3/4" pvc -> 3/4" 90 degree pvc elbow -> flex pvc to sump
down facing (off 3rd tee) 3/4" pvc
ball valve 3/4" (for expansion to my fuge)
now, i just thought that the backup from the ball valve might be slowing it down? i'm not sure.
i'm not a pvc expert... if there's a better way to set this up... tell me! the angles might be a problem, or the flex pvc, i have NO idea.
i was going to do a durso with a tee fitting and cap with a hole drilled in it this weekend.
__________________
40 Breeder, 20H Frag
Aquactinics T5s, CPR Fuge, Deltec AP600, AC Jr, WavySea
|