More work on the standpipes today. I like to build them by drilling through the cap and the pipe connecting the cap and the tee. That way I can turn the cap and be able to adjust the airflow. none of this drilling larger hole until it works right. I glue the top and bottom of the the tee so that i can turn the cap without everything else moving.
Close up of the air adjustment hole

__________________
"I think that you can start the bombs of oceanrunner. They are good bombs for a
rollback."
190g (60x30x25) upgrade in progress, 90g basement sump
Check it out here!